
Rose Crescent,
Cambridge
Client: Electricity Supply Nominees Ltd c/o CBRE Global Investors
Contract Administrator: APS Project Management
Value: £376,520
Programme: 8 weeks
Zelltec Construction was appointed to deliver the full refurbishment of a three-storey retail property, located on a pedestrianised shopping street in the heart of Cambridge. Surrounded by notable historic architecture, the project required a sensitive approach, balancing structural upgrades with careful restoration of traditional features.
-
Installation of fully compliant access scaffolding to external elevations
-
Preparation of an itemised schedule of repairs for windows, doors, shopfront, roof tiles, rafters and brickwork, agreed with contract administrators and delivered by in-house trades
-
Timber care repairs, splicing or full replacement carried out in line with the agreed schedule
-
Specialist refurbishment of basement pavement lights, sourcing original light blocks to exactly match damaged units
-
Installation of structural steels, timbers and lintels as directed by structural engineers’ reports
-
Installation of a damp-proofing system to the basement
-
Installation of acoustic and fire insulation to each floor
-
Redecoration of all external joinery and metalworks, including fire escape staircase, hoppers and downpipes
-
Redecoration to all internal areas in preparation for tenant fit-out








